Climate & GHG Emissions
Managing climate risks and working toward Net Zero by 2050
Climate Change & GHG EmissionsMateriality Level : High
Targets & Performance
| Indicator | Long-term Target 2050 |
Mid-term Target 2030 |
Target 2025 |
Performance 2025 |
|---|---|---|---|---|
| GHG emissions from operations (Scope 1 & 2) vs. baseline year 2022 |
|
At least 30% |
More than 5% |
Increased by 7.85% |
| GHG emissions in value chain (Scope 3) vs. baseline 2025 | At least 25% |
- | - | |
| Collect Scope 3 GHG emission data covering value chain activities | - | - | 100% | 100% |
| Resolve community air pollution complaints within the designated timeframe | 100% | 100% | 100% | 100% |
Risks and Opportunities
Climate change poses significant risks to the Company's business operations in both physical and transition dimensions. Physical risks such as floods, droughts, and heatwaves can impact the industrial estate's infrastructure, utilities, business continuity, and operating costs. Meanwhile, transition risks—including stricter GHG reduction regulations, higher ESG expectations from investors, and the necessary adaptation of operators within the estate—may increase investment costs, reduce competitiveness, and affect long-term investment decisions.
Effectively managing greenhouse gases and adapting to climate change presents an opportunity for the Company to enhance its competitiveness and create long-term value. This is achieved through energy efficiency improvements, the adoption of renewable energy, and the development of low-carbon infrastructure, which all help lower operating costs, strengthen energy security, and support our Net Zero target. Furthermore, upgrading the industrial estate to accommodate low-carbon businesses attracts ESG-conscious investors, builds stakeholder confidence, and opens doors to carbon credit projects and environmental innovations—ultimately driving sustainable corporate growth.
Strategy and Management
Climate change and greenhouse gas emissions are critical factors impacting the industrial estate business, influencing infrastructure stability, energy costs, legal compliance, and stakeholder trust. They also reflect risks associated with extreme weather events and the transition to a low-carbon economy, while simultaneously offering opportunities to develop green infrastructure, optimize resource efficiency, and enhance business competitiveness.
The Company has therefore established an Environmental and Climate Change Policy as a framework for systematic management of greenhouse gases and air pollution, along with a Carbon Footprint Policy to guide data collection and evidence regarding emissions and removals of greenhouse gases related to the organization's activities. The Company aims to build adaptive capacity and resilience to climate change alongside reducing GHG emissions, in pursuit of the Net Zero target by 2050. This includes strict compliance with domestic and international environmental laws and regulations, transparent data disclosure, and stakeholder engagement — driven through energy efficiency improvements, renewable energy promotion, air pollution control and reduction, environmentally friendly infrastructure design and development, as well as continuous communication and transfer of best practices to operators, suppliers, and business partners, ensuring climate change management remains an integral part of responsible business growth across the value chain.
Governance Structure and Oversight
To ensure that climate change and greenhouse gas management operations align with the established policies and targets, the Company has put in place a clear governance structure covering the Board of Directors, management, and operational units. This structure defines the roles, duties, and responsibilities of each unit, as well as establishes processes for regular monitoring, performance reporting, and target reviewing. This enables the Company to effectively manage risks and opportunities, and drive greenhouse gas emission reductions in alignment with business directions.
The Board of Directors holds the ultimate oversight role in climate change and greenhouse gas emissions management, delegating the Corporate Governance and Sustainability Committee to set relevant policy frameworks, strategies, and targets, as well as to consistently monitor progress and evaluate performance. Furthermore, the Board of Directors receives reports on climate change performance, risks, opportunities, and progress toward achieving the Net Zero target at least once a year, serving as a basis for the organization's strategic considerations and investment decisions.
| Responsible Unit | Roles and Responsibilities |
|---|---|
| Board of Directors | Oversee the direction, policies, and operational framework for climate change and greenhouse gas management, ensuring alignment with business strategy and energy and sustainability targets. Consider and approve relevant significant issues and regularly monitor overall progress. |
| Corporate Governance and Sustainability Committee | Review, reconsider, and screen policies, action plans, targets, and performance results on climate change and greenhouse gas management before submission to the Board of Directors. Oversee the systematic and regular identification, assessment, and management of energy and climate issues. |
| Net Zero Greenhouse Gas Management Working Group | Drive practical greenhouse gas management by identifying and assessing emission sources, formulating and advancing action plans and measures to reduce emissions toward the Net Zero target, monitoring and reviewing performance, as well as coordinating with relevant units and reporting significant issues to executives and relevant committees at least once a year. |
| Department Responsible for Net Zero GHG Management | Serve as the primary unit for systematically collecting, storing, tracking, analyzing, and reporting the organization's greenhouse gas emissions data. Monitor performance against targets, coordinate with relevant units to implement emission reduction measures, and propose improvement guidelines when performance does not meet targets. |
Addressing Climate Change
Managing climate change risks is a crucial mechanism for mitigating business impacts and supporting the organization's strategic decision-making. Therefore, the Company has established operational guidelines integrated into its risk management process. This covers the identification and assessment of risks, the formulation of management measures, as well as continuous monitoring and reporting, as follows:
The Company assesses and prioritizes climate-related risks and opportunities, covering both Physical Risks from climate impacts and Transition Risks from the shift toward a low-carbon economy, in alignment with the industrial estate business context. The assessment focuses on short-to-medium-term horizons of 3–5 years to support appropriate planning and strategic decision-making.
| Physical Risks of Climate Change | ||
|---|---|---|
| Key Risk | Impact | Adaptation and Management Measures |
| Floods | Heavy rainfall and flash floods damage drainage systems, internal roads, electrical systems, and utilities, forcing operators to halt or slow production — affecting revenue, business continuity, and investor confidence. |
|
| Drought and Water Scarcity | Drought and water scarcity in some areas may affect water supply capacity for operators within the estate, increasing water management and backup system costs, which impacts service efficiency and competitiveness of the estate. |
|
| Rising Temperatures and Severe Heatwaves | Extreme heat and frequent heatwaves increase energy demand, reduce workforce productivity, and accelerate infrastructure and utility degradation, resulting in higher management and maintenance costs. |
|
| Transition Risks from Climate-Related Regulatory Changes | ||
|---|---|---|
| Key Risk | Impact | Risk Management Measures |
| Changes in GHG Reduction Laws and Regulations | Operating and investment costs rise due to infrastructure and process upgrades for GHG reduction compliance. Competitiveness and ability to attract investors may decline if the estate cannot effectively support low-carbon requirements. |
|
| Stricter Waste and Wastewater Management Requirements | The Company must invest further in waste and wastewater management systems, and project development may be delayed if systems cannot be upgraded to meet new standards. |
|
| Increasing Sustainability Disclosure Standards and Investor Expectations | The ability to attract sustainability-focused investors may decline, potentially resulting in lost opportunities for new project development and negatively affecting corporate reputation, image, and stakeholder confidence. |
|
| Changes in Business Models of Operators within the Estate | Operators' operating costs increase, affecting investment and expansion decisions within the estate, and creating long-term risks to occupancy rates and land utilization. |
|
Corporate GHG Emissions Data
The Company has prepared a Corporate Carbon Footprint Report, with the reporting scope covering the Head Office and all Pinthong Industrial Estate project areas — including Pinthong Industrial Estate, Pinthong Industrial Estate (Laem Chabang), and Pinthong Industrial Estate Projects 3–6. The Company has identified activities that generate both direct and indirect greenhouse gas emissions. GHG emissions are calculated in accordance with the ISO 14064-1 standard and the Corporate Carbon Footprint guidelines issued by the Thailand Greenhouse Gas Management Organization (Public Organization) (TGO), using the latest Emission Factor values announced by the relevant authorities. Activity data is collected from internal operational systems and verified for accuracy before calculation, ensuring that the data is complete, accurate, and comparable year-on-year.
In 2025, the Company was verified and registered for its Corporate Carbon Footprint on 22 April 2025 by the Thailand Greenhouse Gas Management Organization (Public Organization), based on 2024 data.
The Company has prepared its Corporate Carbon Footprint Report covering the period from 1 January to 31 December 2025 — the 5th consecutive year. It is currently under verification by Bureau Veritas (Thailand) Ltd., a body registered with the Thailand Greenhouse Gas Management Organization (Public Organization), and is expected to be completed by March 2026.
The calculated GHG emission quantities and intensities are shown in the following table:
| GHG Emission Scope | Unit | 2565 | 2566 | 2567 | 2568 |
|---|---|---|---|---|---|
| Scope 1 (Direct) | Tons CO2e | 882 | 784 | 912 | 715 |
| Scope 2 (Indirect) | Tons CO2e | 2,177 | 2,281 | 2,334 | 2,585 |
| Scope 1 & 2 (Direct and Indirect) | Tons CO2e | 3,059 | 3,065 | 3,246 | 3,300 |
| Scope 3 (Other Indirect) | Tons CO2e | 520 | 451 | 461 | 4,747 |
| Total GHG Emissions | Tons CO2e | 3,579 | 3,516 | 3,707 | 8,047 |
| GHG Emission Intensity (Scope 1 & 2) per Operational Area (Ha) | Tons CO2e | 2.53 | 2.54 | 2.69 | 2.73 |
1 ha = 6.25 rai. GHG Intensity Calculation (tCO2e/ha): Total GHG Emissions (tCO2e) / Total Area (Ha)
Total GHG Emissions
Direct GHG Emissions
(Scope 1)
Indirect GHG Emissions
(Scope 2)
Direct and Indirect GHG Emissions
(Scope 1 & 2)
Based on the Company's 2025 GHG emissions calculation, Scope 1 direct emissions totaled 715 tCO₂e, primarily from fuel consumption for company vehicles and machinery, backup power generation, and refrigerant leaks from air conditioning and cooling equipment in office buildings and estate utilities. Scope 2 emissions from purchased electricity were 2,585 tCO₂e, mainly from electricity used in central utilities — water production and distribution, wastewater treatment, pumping systems, estate lighting, and office buildings. Total Scope 1 & 2 emissions were 3,300 tCO₂e, an increase of 1.66% from 2024 and 7.88% from the 2022 base year. This was driven by the expansion of saleable and developed areas, an increase in operators both under construction and in operation, and consequently higher demand for central utilities — especially electricity for water production/distribution and wastewater treatment. At the same time, the Company has continued to implement energy efficiency measures to control the rate of GHG emission growth per unit area in line with business growth.
In 2025, the Company's Scope 3 other indirect emissions totaled 4,747 tCO₂e. Significant emission sources include Category 1: purchased goods and services for water production and wastewater treatment; Category 2: real estate and factory buildings constructed by the Company for lease; Category 3: purchased electricity; Category 5: waste disposal from organizational activities; and Category 13: electricity use from leased downstream assets.
In 2025, the Company added new emission Categories and expanded data collection to cover more value-chain activities and all estate projects. Along with increased construction activity, growth in operators within the estate, and higher waste volumes entering the estate's central management system in line with economic growth, Scope 3 emissions increased by 929.71% from 2024. Analysis by activity shows that the largest share comes from electricity use from leased downstream assets, at 1,872.77 tCO₂e or 39.46% of total Scope 3 other indirect emissions.
Other Indirect GHG Emissions
(Scope 3)
Activities
Scope 3 Emission Activities
Greenhouse Gas Emission Reduction
The Company's climate risk assessment shows that in addition to the impacts of more severe weather, greenhouse gas emission levels are linked to regulatory risks, energy costs, competitiveness, and stakeholder expectations. The Company has therefore established a framework for managing greenhouse gases alongside building adaptive capacity, aimed at achieving Net Zero emissions, as follows:
In 2025, the Company used climate risk assessment results and GHG emission data as key inputs to develop operational plans and measures aligned with its organizational strategy, covering GHG management across Scope 1, Scope 2, and Scope 3 to enable efficient emission reduction and achieve the established targets.
| Strategy | Scope 1 | Scope 2 | Scope 3 | Operational Approach |
|---|---|---|---|---|
| Energy Efficiency Improvement | • |
|
||
| Renewable or Alternative Energy | • | • |
|
|
| Circular Resource Management and Efficient Waste Management | • |
|
||
| Supply Chain Collaboration | • |
|
The Company prioritizes reducing GHG emissions at source through energy efficiency improvements, renewable energy adoption, and process improvements. At the same time, the Company is implementing measures to enhance CO₂ removal from the atmosphere through green area development, strengthening the organization's carbon sinks. This serves as a supplementary measure and does not replace the need to directly reduce emissions from operations.
Projects and Activities for GHG Emission Reduction and Absorption
Energy Saving Project in Utility Areas
The Company continuously implements measures to reduce Scope 1 and Scope 2 GHG emissions through energy efficiency improvements, fuel reduction, and integration of renewable energy into operations — aimed at reducing environmental impacts while enhancing organizational efficiency. Key projects and measures are as follows:
LED Street Lighting Replacement Project
This project aims to improve energy efficiency within the industrial estate while reducing operating costs and indirect GHG emissions from electricity use. Street lights in Pinthong Industrial Estate Projects 1–6 that still use old high-consumption, short-lifespan, high-maintenance lamps with lower lighting efficiency are being replaced with LED lamps that provide sufficient, consistent illumination, lower energy use, and longer service life. Over the past 5 years, High Pressure Sodium (HPS) lamps have been progressively replaced with high-efficiency LEDs, with over 1,600 lamps replaced cumulatively across the estate.
Over the past year, the Company's continuous energy-saving measures reduced electricity consumption by an average of 5,096 kWh per month, equivalent to a reduction of 29.05 tCO₂e per year in Scope 2 indirect emissions (calculated using the 0.4750 kgCO₂e/kWh emission factor from the Thailand Greenhouse Gas Management Organization). This also resulted in savings of more than 10% per year on lighting-related electricity costs.
Sensor & Control System Installation in Utility Systems
Energy and water usage in water production and wastewater treatment systems are directly linked to equipment control efficiency. Previously, control relied on manual operation or automated systems with limitations, causing some equipment to run inconsistently with actual demand — leading to excess energy and water use, higher costs and maintenance burden, equipment wear risks, and system stability and water quality issues due to lack of precise control. To address this, the Company has installed an automated Sensor & Control System for equipment in the water production and wastewater treatment systems, using sensors to measure relevant parameters such as water volume, water level, water quality, and system load, to command equipment operation in line with actual conditions. This reduces electricity and water use, lowers operating costs, improves precision and stability of utility systems, and supports efficient organizational resource management.
Solar Office Project
The Company has installed a 76.8 kWp solar rooftop system on its office building and a solar farm at Pinthong Industrial Estate (Laem Chabang) for internal office use, generating electricity from renewable energy to replace grid electricity. The system produces a total of 112,090 kWh per year, accounting for 30.1% of total office electricity consumption. This reduces electricity use, lowers long-term electricity costs, and cuts indirect GHG emissions from operations, while strengthening energy security and promoting efficient resource use. The Company plans to increase the share of renewable electricity for its office building to more than 70% by 2030.
Solar-Powered Surface Aerator Installation Project
The solar-powered aerator project in the wastewater treatment system is a key measure for reducing GHG emissions from operations. It aims to reduce grid electricity use — a source of Scope 2 indirect emissions — for the wastewater treatment system which runs continuously. Using solar energy (a renewable energy source) to drive the aerators enables clean energy to replace fossil-fuel-based electricity, reducing GHG emission intensity per unit of activity and long-term energy costs, while strengthening energy security for the industrial estate's utilities.
Beyond reducing emissions from electricity use, improved treatment efficiency through sufficient oxygen supply also reduces anaerobic conditions — the source of methane (CH₄) and hydrogen sulfide (H₂S) from organic matter decomposition in treatment ponds — further reducing GHG emissions from the wastewater treatment process. It also enables more efficient microbial digestion of organic matter, ensuring effluent quality meets standards, reducing odors, and increasing long-term system stability.
Adoption of High-Efficiency Air Conditioners
The Company prioritizes improving energy efficiency and reducing GHG emissions from air conditioning systems, which account for a high share of office electricity use in both operating hours and power consumption. The Company has selected and replaced equipment with high-efficiency air conditioners, alongside choosing environmentally friendly refrigerants — specifically R32, which has a lower Global Warming Potential (GWP) than older refrigerants like R22 and R410A, with better heat-transfer efficiency. This helps reduce GHG emissions in two key dimensions: (1) reduced electricity consumption from higher cooling efficiency, lowering Scope 2 indirect emissions, and (2) reduced direct emissions from refrigerant leakage (Fugitive Emissions: Scope 1). High-efficiency air conditioners also reduce energy burden and long-term electricity costs, supporting the Company's energy management aligned with the Net Zero GHG Emissions goal, reflecting climate-conscious operations throughout the equipment lifecycle.
Green Space Development Project for Carbon Absorption within the Industrial Estate
Pinthong Industrial Estate Projects 3 and 4 Area
The Company is developing a 29-rai green area within Pinthong Industrial Estate Projects 3 and 4 by planting approximately 30,000 high-carbon-absorption trees — including Yang Na, Tabaek, Payom, Pradoo, Chamuang, Payung, Jik Nam, and Takien Thong — to increase carbon sequestration from the atmosphere and expand the organization's carbon reservoir. The project includes continuous monitoring and maintenance of green areas to ensure efficient carbon storage and to serve as a data basis for long-term GHG removal calculations.
This project is part of a long-term approach to support GHG removal and offsetting alongside emission reductions from the Company's operations and value chain. The Company plans to register the project under the Thailand Voluntary Emission Reduction Program (T-VER) by 2026. The actual carbon credits received will depend on project registration, applicable calculation methods, and monitoring results under the defined criteria. If certified, the Company expects to generate more than 500 tCO₂e of carbon credits over the project's lifetime, supporting the Net Zero GHG Emissions target while enhancing ecosystem health and environmental quality within the industrial estate.
The Company undertakes environmental activities in partnership with communities and stakeholders to support climate change mitigation — including the Khlong Manao Community Forest Green Ecosystem Project, and the 2025 "Let's Zero Together — Plant to (Reduce) for a Sustainable Future" project. These aim to absorb carbon dioxide and expand green areas through continuous reforestation and restoration activities, both within project areas and surrounding communities, with a focus on planting native species suitable for the local ecosystem to promote biodiversity and environmental balance.
Communication and Education on GHG Reduction Targets for Employees and Business Partners
Communicating GHG Reduction and Net Zero Targets to Employees
The Company prioritizes building employee understanding and engagement in driving GHG reduction and Net Zero GHG Emissions targets, communicating and transferring operational approaches continuously through diverse channels and activities — including the Environmental and Climate Change Policy announcement, management meetings, senior executive communications, and internal documents — so employees understand organizational direction and their role in supporting the targets. This is coupled with linking organizational targets to unit- and individual-level practices such as energy efficiency, resource use reduction, in-unit waste management, and daily environmental operations.
The Company regularly organizes training and internal communications on climate change, GHG reduction, and Net Zero concepts to build knowledge, understanding, and attitudes aligned with sustainability goals. This starts with capacity-building for the Net Zero GHG Management Working Group through training by expert GHG calculation consultants, and sending executives and department heads to GHG management training from regulatory bodies such as the Stock Exchange of Thailand. Employee engagement is promoted through energy conservation campaigns, waste reduction, office energy reduction projects, and environmental CSR activities such as community reforestation. Performance is tracked and progress, results, and successes are continuously communicated to employees to build pride and motivation in driving the organization toward climate targets.
Air Quality Management
Industrial estate operations — which host manufacturing, transportation, and utility services — can generate air pollutant emissions from various sources, such as dust from construction and traffic, fuel combustion from vehicles and machinery, operators' production processes, as well as odors and other air pollutants that may affect air quality within the estate and surrounding areas. The Company therefore places importance on systematic air quality management to control and reduce impacts on the environment, worker health, surrounding communities, and stakeholder confidence, through the following strategies:
The Company also conducts comprehensive air quality risk assessments arising from estate operations and activities of operators within the area, leading to the formulation of appropriate prevention, control, and corrective measures based on each risk factor.
Air Quality Risk Assessment and Preventive/Corrective Measures
| Risk Factor | Management and Oversight Measures |
|---|---|
| Particulate Matter (TSP / PM-10) |
|
| Sulfur Dioxide (SO2) / Nitrogen Oxides (NOx) |
|
| Volatile Organic Compounds (VOCs) |
|
| Odor Disturbance from Industrial Activities |
|
| Overall Air Quality within the Estate |
|
As an industrial estate developer and operator, the Company prioritizes controlling and reducing air quality impacts from factory operations within the estate by requiring operators to comply with emission and pollution control standards set by law, including measures specified in the Environmental Impact Assessment (EIA) report. The Company continuously supervises, verifies, and monitors factory performance. If emissions exceed standards, the Company notifies operators for corrective action and coordinates with relevant agencies such as the Industrial Estate Authority of Thailand (IEAT) to proceed with the corrective process.
The Company has also installed an Air Quality Monitoring Station (AQMS) to continuously monitor ambient air quality around the estate, and prepares EIA Monitoring Reports every 6 months. Measurements are conducted twice a year by registered expert firms, covering all 6 Pinthong Industrial Estate projects across 23 monitoring points to assess air quality impacts from estate and operator activities. Parameters measured include Total Suspended Particulates (TSP), PM10, Nitrogen Dioxide (NO2), and Sulfur Dioxide (SO2) at 1-hour and 24-hour averages.
Pinthong Industrial Estate 1
| Monitoring Point | Pollutant Type | Parameter | Unit | Measured Value | Standard | Result |
|---|---|---|---|---|---|---|
| 1. Khao Din Wanaram Temple | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.041-0.062 | 0.331/ | Pass |
| PM10 | PM 10 | mg/m3 | 0.02-0.032 | 0.121/ | Pass | |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.001-0.013 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | 0.004-0.005 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | 0.004-0.004 | 0.121/ | Pass | |
| 2. Project Area | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.045-0.061 | 0.331/ | Pass |
| PM10 | PM 10 | mg/m3 | 0.011-0.028 | 0.121/ | Pass | |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.001-0.002 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | 0.003-0.005 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | 0.004-0.004 | 0.121/ | Pass | |
| 3. Ban Sak Community | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.044-0.068 | 0.331/ | Pass |
| PM10 | PM 10 | mg/m3 | 0.017-0.034 | 0.121/ | Pass | |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.001-0.005 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | 0.003-0.017 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | 0.005-0.016 | 0.121/ | Pass | |
| 4. Ban Khao Din Community | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.050-0.075 | 0.331/ | Pass |
| PM10 | PM 10 | mg/m3 | 0.022-0.042 | 0.121/ | Pass | |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.003-0.019 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | 0.022-0.042 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | 0.027-0.039 | 0.121/ | Pass |
Pinthong Industrial Estate 2
| Monitoring Point | Pollutant Type | Parameter | Unit | Measured Value | Standard | Result |
|---|---|---|---|---|---|---|
| 1. Khao Chi Thammanimit Temple | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.033-0.05 | 0.331/ | Pass |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.007-0.033 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | 0.001-0.001 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | 0.001-0.001 | 0.121/ | Pass | |
| 2. Office Building | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.033-0.051 | 0.331/ | Pass |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.006-0.027 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | <0.001-0.001 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | <0.001-0.001 | 0.121/ | Pass |
Pinthong Industrial Estate 3
| Monitoring Point | Pollutant Type | Parameter | Unit | Measured Value | Standard | Result |
|---|---|---|---|---|---|---|
| 1. Ban Khao Chi | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.02-0.031 | 0.331/ | Pass |
| PM10 | PM 10 | mg/m3 | 0.008-0.019 | 0.121/ | Pass | |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.001-0.016 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | 0.001-0.002 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | 0.001-0.001 | 0.121/ | Pass | |
| 2. Khao Tabaek Temple | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.028-0.067 | 0.331/ | Pass |
| PM10 | PM 10 | mg/m3 | 0.017-0.031 | 0.121/ | Pass | |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.002-0.018 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | 0.004-0.004 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | 0.004-0.004 | 0.121/ | Pass | |
| 3. Project Office | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.029-0.046 | 0.331/ | Pass |
| PM10 | PM 10 | mg/m3 | 0.012-0.027 | 0.121/ | Pass | |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.006-0.012 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | 0.012-0.013 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | 0.012-0.013 | 0.121/ | Pass | |
| 4. Yang En Temple | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.02-0.029 | 0.331/ | Pass |
| PM10 | PM 10 | mg/m3 | 0.008-0.022 | 0.121/ | Pass | |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.001-0.002 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | 0.009-0.012 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | 0.009-0.011 | 0.121/ | Pass | |
| 5. Ban Rai Khon Samo | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.096-0.144 | 0.331/ | Pass |
| PM10 | PM 10 | mg/m3 | 0.038-0.068 | 0.121/ | Pass | |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.004-0.022 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | 0.005-0.008 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | 0.006-0.007 | 0.121/ | Pass |
Pinthong Industrial Estate 4
| Monitoring Point | Pollutant Type | Parameter | Unit | Measured Value | Standard | Result |
|---|---|---|---|---|---|---|
| 1. Ban Khao Chi | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.029-0.061 | 0.331/ | Pass |
| PM10 | PM 10 | mg/m3 | 0.015-0.032 | 0.121/ | Pass | |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.003-0.005 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | 0.003-0.004 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | 0.002-0.018 | 0.121/ | Pass | |
| 2. Yang En Temple | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.03-0.047 | 0.331/ | Pass |
| PM10 | PM 10 | mg/m3 | 0.011-0.025 | 0.121/ | Pass | |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.004-0.005 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | 0.004-0.005 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | 0.001-0.018 | 0.121/ | Pass | |
| 3. Noen Krabok Temple | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.029-0.041 | 0.331/ | Pass |
| PM10 | PM 10 | mg/m3 | 0.017-0.029 | 0.121/ | Pass | |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.016-0.097 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | 0.024-0.038 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | 0.001-0.013 | 0.121/ | Pass | |
| 4. Ban Rai Khon Samo | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.039-0.072 | 0.331/ | Pass |
| PM10 | PM 10 | mg/m3 | 0.027-0.044 | 0.121/ | Pass | |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.03-0.054 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | 0.039-0.054 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | 0.002-0.028 | 0.121/ | Pass |
Pinthong Industrial Estate 5
| Monitoring Point | Pollutant Type | Parameter | Unit | Measured Value | Standard | Result |
|---|---|---|---|---|---|---|
| 1. Khao Kan Song Temple | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.041-0.061 | 0.331/ | Pass |
| PM10 | PM 10 | mg/m3 | 0.005-0.022 | 0.121/ | Pass | |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.003-0.005 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | 0.003-0.004 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | 0.004-0.019 | 0.121/ | Pass | |
| 2. Phan Sadet Nok Temple | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.021-0.043 | 0.331/ | Pass |
| PM10 | PM 10 | mg/m3 | 0.008-0.016 | 0.121/ | Pass | |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.002-0.004 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | 0.003-0.003 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | 0.001-0.002 | 0.121/ | Pass | |
| 3. Map Saen Suk | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.047-0.15 | 0.331/ | Pass |
| PM10 | PM 10 | mg/m3 | 0.016-0.036 | 0.121/ | Pass | |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.005-0.011 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | 0.007-0.008 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | 0.002-0.01 | 0.121/ | Pass | |
| 4. Chaloem Phra Kiat Health Promoting Hospital | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.027-0.039 | 0.331/ | Pass |
| PM10 | PM 10 | mg/m3 | 0.01-0.029 | 0.121/ | Pass | |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.003-0.004 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | 0.003-0.004 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | 0.001-0.01 | 0.121/ | Pass |
Pinthong Industrial Estate 6
| Monitoring Point | Pollutant Type | Parameter | Unit | Measured Value | Standard | Result |
|---|---|---|---|---|---|---|
| 1. Ang Kaeo Temple | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.019-0.034 | 0.331/ | Pass |
| PM10 | PM 10 | mg/m3 | 0.011-0.022 | 0.121/ | Pass | |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.005-0.014 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | 0.006-0.006 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | 0.001-0.013 | 0.121/ | Pass | |
| 2. Nikhom Phatthana District Public Health Office | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.02-0.044 | 0.331/ | Pass |
| PM10 | PM 10 | mg/m3 | 0.018-0.039 | 0.121/ | Pass | |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.007-0.01 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | 0.008-0.008 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | 0.001-0.014 | 0.121/ | Pass | |
| 3. Pakorn Thammaram Temple | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.011-0.029 | 0.331/ | Pass |
| PM10 | PM 10 | mg/m3 | 0.009-0.019 | 0.121/ | Pass | |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.004-0.027 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | 0.013-0.024 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | <0.001-0.023 | 0.121/ | Pass | |
| 4. Dok Krai Temple | Total Suspended Particulates (TSP) | TSP | mg/m3 | 0.017-0.024 | 0.331/ | Pass |
| PM10 | PM 10 | mg/m3 | 0.006-0.016 | 0.121/ | Pass | |
| Nitrogen Dioxide (NO2) | NO2 | ppm | 0.002-0.004 | 0.172/ | Pass | |
| Sulfur Dioxide (SO2) 1-hour | SO2 | ppm | 0.002-0.003 | 0.303/ | Pass | |
| Sulfur Dioxide (SO2) 24-hour | SO2 | ppm | 0.001-0.001 | 0.121/ | Pass |
Notes :
1/ = Notification of the National Environment Board No. 24 (B.E. 2547) on Ambient Air Quality Standards
2/ = Notification of the National Environment Board No. 33 (B.E. 2552) on Ambient Nitrogen Dioxide Standards
3/ = Notification of the National Environment Board No. 12 (B.E. 2538) and No. 21 (B.E. 2544) on Ambient 1-hour Sulfur Dioxide Standards
Air Pollution Complaint Management
The Company has established a systematic process for managing environmental complaints from communities surrounding the industrial estate, under the framework of the estate's environmental management system. Multiple complaint channels are provided for stakeholders, including postal mail, email, personal communication, telephone, and a complaint/whistleblower box at the Company's sales office, ensuring timely awareness and investigation of concerns. Clear procedures are defined for fact-finding, follow-up, and communication back to complainants.
In 2025, the Company received one air pollution complaint from communities surrounding the industrial estate. The complaint involved odors, dust, and smoke from operator activities within Pinthong Industrial Estate, which occurred during certain periods and may have affected the quality of life of nearby communities. Upon notification, the Company immediately conducted a fact-finding investigation together with the environmental unit of the Industrial Estate Authority of Thailand, representatives of affected communities, and relevant government agencies. The investigation found that the cause was a temporary malfunction of production processes and air pollution control systems, resulting in reduced pollution control efficiency during that period.
The Company implemented corrective actions in accordance with the measures and requirements of the industrial estate, by having operators temporarily halt or modify production processes that caused the emissions, under the oversight of the estate. Inspections, maintenance, and efficiency improvements of air pollution control systems were carried out to meet legal standards, along with increased air quality monitoring frequency and continuous reporting to the estate's environmental unit. Preventive maintenance plans were reviewed, and environmental awareness training was strengthened for operating personnel. In addition, the Company provided care and remediation for those affected, and worked with the Industrial Estate Authority of Thailand to communicate and clarify the facts to the community, listen to feedback, explain corrective actions and preventive measures through stakeholder engagement mechanisms, in order to build confidence and reduce concerns among surrounding communities.
Following corrective actions and follow-up monitoring, no air pollutant emissions exceeded standards, and no further complaints were received from the community. The Company will continue to improve operational processes and environmental management to prevent recurrence and continuously enhance air quality control effectiveness.
In 2025, the Company had no significant violations of environmental laws or requirements arising from its operations, and was not subject to any fines or penalties related to air pollutant emissions. The Company continues to closely monitor and review legal compliance to ensure its operations strictly adhere to the requirements of regulatory authorities.
Communication and Stakeholder Engagement in Reducing Air Pollutant Emissions
In 2025, Pinthong Industrial Estate (Projects 1–5) continued the "Green Star Award" (Thong Khao Dao Khiao) program, promoting public participation in the governance of factories within the estate under environmental governance principles. The program enables communities and surrounding stakeholders to be informed of and engaged in monitoring the environmental management of operators within the estate. The assessment covers 5 dimensions and 13 topics, with key environmental criteria on systematic air quality management: Topic 6 on air quality monitoring data and results for factories with stacks, and proper maintenance of air pollution treatment systems to ensure operational readiness; and Topic 7 on chemical vapor management for factories using volatile organic compounds (VOCs), to control emissions within legal standards and reduce impacts on surrounding communities.
Pinthong Industrial Estate also communicates and advises operators on criteria, indicators, and practices aligned with the requirements of the Industrial Estate Authority of Thailand (IEAT). It conducts follow-up, assessment, and provides recommendations on various management aspects — including air, water, and waste pollution control; chemical and hazardous material management; efficient use of energy and resources; and occupational health and safety — so that operators can continuously improve their performance against the assessment criteria. In addition, the estate encourages operators to communicate environmental information and build community relationships through feedback mechanisms and complaint management, enhancing transparency and confidence for sustainable coexistence. This is coupled with training activities and the exchange of best practices in air pollution control and environmental emergency preparedness.
Assessment results showed that all 7 participating factories passed the evaluation with scores above 80%, ranging from good to excellent, reflecting the effectiveness of the air quality management system — including monitoring, source control, treatment system maintenance, and continuous environmental operations. The Company analyzes the assessment results to track progress and uses them as input for long-term planning of environmental management within the industrial estate.